ANOSLE «Centre-Expert»

On the adoption of technical regulations customs union Elevator Safety TR TC 011/2011



Customs Union Commission

Decision

of October 18, 2011 N 824

On the adoption of technical regulations customs union

"Elevator Safety"

(Ver. Decision of the Commission of the Customs Union, EurAsEC from 09.12.2011 N884, from 04.12.2012 N 249)

In accordance with

Article 13

of the Agreement on common principles and rules of technical

regulation in the Republic of Belarus, the Republic of Kazakhstan and the Russian Federation on 18

November 2010, the Commission of the Customs Union (hereinafter

-

the Commission) has decided:

1.

Adopt technical regulations of the Customs Union "Secu

rity lifts" (TR TC 011/2011) (attached).

2.

Approve:

2.1.

The list of

standards

on a voluntary basis,

in

compliance with the technical regulations of the

Customs Union "Security lifts" (TR TC 011/2011) (attached)

2.2.

The list of standards co

ntaining rules and methods (tests) and measurements, including the

rules of sampling necessary for the application and enforcement of the technical regulations of the

Customs Union "Security lifts" (TR TC011/2011) and the implementation of assessment (conf

irmation)

of products (attached).

3.

Install:

3.1.

Technical Regulations of the Customs Union "Safety of lifts" (hereinafter

-

the Technical

Regulations) come into force on Februa

ry 15, 2013,

(

Ver

. Decisions of the Commission of the Customs U

nion, EurAsEC

from 09.12.2011 N 884

)

3.3.1.

Until November 15, 2013 allowed the production and issuance of the customs territory of the

Customs Union of products that are not subject to the e

ntry into force of the Technical Regulations

mandatory assessment (confirmation) mandatory

requirements established

regulations of the

Customs Union, or the law of the state

-

a member of the Customs Union, without documents

mandatory assessment (confirmat

ion) and unmarked national conformity

(a mark of market)

(

Ver

. Decisions of the Commission of the Customs Union, EurAsEC

from 04.12.2012 N 249

)

3.2.

Until March 15, 2015 allowed the production,

putting into circulation of products in accordance

with regulatory requirements,

previously established

regulations of the Customs Union

or

legislation

State

-

a member of the Customs Union on its territory, in the presence of evaluation

documents (confirm

ation) of the equipment required

requirements, issued or adopted before the

effective date of the Technical Regulations.

(in red. Decisions of the Commission of the Customs Union, EurAsEC

from

09.12.2011 N 884

)

2

The above products are marked national conformity (a mark of market), in accordance with the

laws of the state

-

a member of the Customs Union.

Labeling

of such products with a mark of one product on the market states

-

members of the

customs union is not permitted;

3.3.

Appraisal Documents (confirmation) of compliance with mandatory requirements of the

regulations of the Customs Union

or law

of the

State

-

a member of the Customs Union, issued or

adopted for the products to which the technical regulation

Technical Regulations (hereinafter

-

the

products), before the coming into force of technical regulations shall be valid until the end of their

vali

dity, but not later than 15 March 2015.

These documents, issued or adopted prior to the date of

publication of this Decision shall be valid until the end of their validity.

(in red. Decisions of the Commission of the Customs Union, EurAsEC

from 09.12.2011 N 884

)

the date of entry into force of the Technical Regulations issuance or acceptance evaluation

documents ( confirmation)conformity of the product with mandatory requirements

previous

ly

established regulations of the Customs Union, or the law

State

-

a member of the Customs Union is

not allowed.

Elevators, put into service before the entry into force of this Technical Regulation and exhaust

specified lifetime, must be brought into

compliance with the Technical Regulations before the end of

its service life;

3.4.

Handling products released into circulation during the period of evaluation documents

(confirmation) specified in subparagraph 3.3 of

this Solutions

and products refer

red to in paragraph

3.3.1 of this Decision shall be allowed during the life of products, established in accordance with the

laws of the state

-

a member of the Customs Union.

(in red. Decisions of the Commission of the Customs Union, EurAsEC

from 04.12.2012 N 249

)

4 .

Secretariat of the Commission with the Parties to prepare a draft plan of action necessary for the

implementation of technical regulations and, within three months from the date of

entry into force of

this

Decision provide

a submission to the Commission for approval in due course.

5.

Kazakh Party with Parties on the basis of the monitoring results of the application of standards to

ensure the preparation of proposals to

update Li

st

of standards referred to in paragraph 2 above, and

present at least once a year from the date of entry into force of technical regulations in the Secretariat

of the Commission for approval by the Commission in the prescribed manner.

6.

Russian part

y with Parties to ensure development of a standard to determine the energy

efficiency class elevator.

7.

Parties:

7.1.

to the date of entry into force of the Technical Regulations define the state control (supervision),

responsible

for state

cont

rol (supervision) over compliance with the Technical Regulations, and to

inform the

Commission;

20

3.6.

availability of measures and (or) means of evacuation from the cabin fire, stopped between

floors;

3.7.

use in the construction coupe

cabin materials that reduce the risk of fire danger indices

applicable to combustibility, flammability, smoke

-

forming ability, flame spread and toxic when burned.

4.

To ensure the safety elevator, designed for connection to a supervisory control, sub

ject to the

following special requirements:

It shall be possible to remove the signal for transmission from the elevator to the unit supervisory

control over his work, the following information:

on operation of electrical safety circuits;

the

unauthorized opening of the landing doors;

opening the door (cover) control unit elevator machine room.

5.

To ensure the safety elevator to be installed in the building, construction, which may deliberate

damage lift equipment must meet the follo

wing specific requirements:

5.1.

walling coupe cabin and the walls, ceiling and floor should be made

of materials that reduce

the risk of intentional damage or ignition;

5.2.

control devices, alarm systems, lighting in the cabin and on landings

must be designed and

implemented from materials that reduce the risk of intentional damage or ignition;

5.3.

should provide a solid fence mine;

5.4.

availability of deducing lift from "Normal operation" to unauthorized opening of the landing

door

s with no car on the floor in the "normal operation".

Return to "Normal operation" should be the

staff.

Annex 2

to the technical regulations

of the Customs Union

"Security lifts"

LIST OF

SAFETY DEVICES LIFT subject to mandatory certification

1.

Buffer:

-

Energy storage

type (except

for buffers ener

gy storage

type LINEAR)

-

with non

-

linear characteristics,

-

with amortized return stroke;

-

E

nerg

y storage

type.

2.

Hydro

-

a

p

parat

us

security (explosive valve).

21

3.

Door lock shaft.

4.

Catchers.

5.

Speed

limiter.

Annex 3

to the technical regulations

of the Customs Union

"Security lifts"

SCOPE AND APPLICATION

CIRCUITS CONFORMITY LIFT, the safety requirements of technical

regulations LIFT "eleva

tor safety"

1.

Scheme 1c:

1.1.

accredited testing laboratory:

is testing and measurement of the elevator at the site of installation or on a test bench in a manner

and amount established by the standards of the list approved by the Commissio

n of the Customs

Union,

prepares the test and measurement protocols.

1.2.

Certification Body:

analyzes the object of certification of conformity, test results and measurement requirements of

technical regulations;

analyzes the state of p

roduction,

execute and issue the applicant a certificate of conformity with the positive results of the analysis of

data and evidentiary materials listed in Article 6 of these technical regulations, as well as the test

results and the measurements mad

e

by the accredited test laboratory,

carries out inspection control of the certified object of certification.

Frequency of inspection control

of established

authority certification

, but at least once a year.

2.

Scheme 3c (for a time of

manufactured parts) and Scheme 4c (for a single production):

2.1.

accredited testing laboratory:

is testing and measurement of the elevator at the site of installation or on a test bench in the

manner and amount established by the standards of th

e list approved by the Commission of the

Customs Union,

prepares the test and measurement protocols;

2.2.

Certification Body:

analyzes the relevant facility certification, test results and measurement requirements of technical

22

regulations;

Complete and issue the applicant a certificate of conformity with the positive results of the analysis

of data and evidentiary materials listed in Article 6 of these technical regulations, as well as the test

results and measurements performed by accredi

ted testing laboratory.

3.

4d scheme (Scheme declaration):

3.1.

Applicant:

Prepare own evidence referred to in Article 6 of this technical regulation;

applies to the accredited testing laboratory (center) for the assessment of conformity

in the form of

technical examination of the elevator;

3.2.

accredited testing laboratory (center):

evaluation of correspondence in the form of an elevator inspection,

prepares an act of technical examination elevator;

3.3.

applicant on

the basis of their own evidence and the positive results of the technical

examination draws declaration of conformity.

Members of the Coordinating Committee for Technical Regulation, application of sanitary,

veterinary and phytosanitary

measures and authorized representatives of the Parties:

From the Republic of Belarus

Of the Republic of Kazakhstan

From the Russian Federation

VN Roots

RA Satbaev

VY Salamatov

VM Kazakevich

SS Khasenov

ON Aldoshin

IA

Zastenskaya

NO Sadvakasov

AL Safonov

Executive secretary of the

Coordination Committee

MG Chuiko

The experts of the Parties:

From the Republic of Belarus

Of the Republic of Kazakhstan

From the Russian Federation


How do I get a certificate?

Get expert advice